This job was posted by https://idahoworks.gov : For more information,please see: https://idahoworks.gov/jobs/2148451
Consultants please conduct a seated interview. Applicants must have 20days experience with Farm / Irrigation / Livestock work. Applicantshired must be able to obtain a valid driver\'s license as driving onpublic roads may be required. Applicants must be able to lift up to 100pounds. Dates of need are (3/15/2024 11/1/2024). This order is for workin Kimberly, Idaho area. Worker will be required to perform a variety ofduties related to the production of beans, wheat, barely, corn, peas,and alfalfa. The majority of the work activities during the overallcontract period, however, will be related to irrigation. General FarmWork will include the following responsibilities: maintain, drive,attach, and operate farm implements/tractors/equipment to till soil,plant, cultivate, fertilize, and harvest crops; make minor mechanicaladjustments and repairs on farm machinery; may mix and/or spraychemicals (according to appropriate restrictive use laws, when/ifapplicable); remove undesirable and excess growth from crops or farmgrounds; remove rocks from field; paint/repair/maintain farm structures;perform general cleanup of farm areas; drive, load/unload trucks;operate vehicle, motor bike, or all-terrain vehicle in the course ofperforming duties; transport crops to market. Irrigation duties willinclude the following: Hand lines: connect pipes; check alignment ofpipe and adjust for proper water distribution; attach lines to watersupply; turn on pump; turn valves to start flow of water; disassemblelines and carry pipes across fields at specified intervals; move pipesthrough freshly irrigated crops and/or plowed fields where mud may bedeep at times; lift and carry pipe sections weighing approximately 40pounds on a sustained basis. Wheel lines: start gasoline engines andoperate controls to move lines across fields at specified intervals.Flood Irrigation: lift gate in side of flooded irrigation ditch/pipepermitting water to flow into bordered section of field; shovel and packdirt in low spots of embankment or cut trenches in high areas to directwater flow; close gate in ditch/pipe when bordered section is flooded;open gate or connect pipe to underground pipe system that releases waterflow into reservoir or ditch; siphon water from flooded reservoir orditch to channel water into designated areas; shovel or hoe soil toclear ditches/furrows and build embankments to appropriately channelwater; mix and apply proper solutions to fill holes/cracks in pipes,ditches, and spillways, and make minor repairs to metal, concrete, andwooden frameworks in pipe and ditch valves and gates. Other IrrigationDuties: remove pipes/wheel lines from storage and lay out/place inpredetermined patterns in fields; lubricate, adjust, repair, and replaceparts such as sprinkler heads and drive chains using hand tools; observerevolving sprinklers and adjust to ensure proper operation and uniformdistribution of water; disassemble, service, and storepipes/mainlines/wheel lines after irrigation season. To meet minimumacceptable performance standards when irrigating, the worker must, aftera 10-day conditioning period, move an average of at least 48 40-footsections of 3-inch pipe or 44 40-foot sections of 4-inch pipe per hourunder normal working conditions.