This job was posted by https://idahoworks.gov : For more information,please see: https://idahoworks.gov/jobs/2151170
Consultants please conduct a seated interview. Dates of need are3/15/2024-11/1/2024 This order is for work in Paul, Idaho area.Applicant `MUST HAVE` 20 days experience as a general farmworker/irrigator/livestock worker and the name and number of thereference who has first hand knowledge and can verify the workersexperience. Worker will be required to perform a variety of dutiesrelated to the production of alfalfa, barley, peas, sugar beets, andwheat. General Farm Work will include the following responsibilities:maintain, drive, attach and operate farm implements/tractors/equipmentto till soil, plant, cultivate, fertilize and harvest crops; make minormechanical adjustments and repairs on farm machinery; may mix and/orspray chemicals (according to appropriate restrictive use laws, when/ifapplicable); remove undesirable and excess growth from crops or farmgrounds; remove rocks from field; paint farm structures; replace/repairfencing; perform general cleanup of farm areas; drive, load/unloadtrucks; operate motor bike or all-terrain vehicle in the course ofperforming duties. Irrigation duties will include the following: Handlines: connect pipes; check alignment of pipe and adjust for properwater distribution; attach lines to water supply; turn on pump; turnvalves to start flow of water; disassemble lines and carry pipes acrossfields at specified intervals; move pipes through freshly irrigatedcrops and/or plowed fields where mud may be deep at times; lift andcarry pipe sections weighing approximately 40 pounds on a sustainedbasis. Wheel lines: start gasoline engines and operate controls to movelines across fields at specified intervals. Pivots: push on switch thatactivates circle sprinkler system. Flood Irrigation: lift gate in sideof flooded irrigation ditch/pipe permitting water to flow into borderedsection of field; shovel and pack dirt in low spots of embankment or cuttrenches in high areas to direct water flow; close gate in ditch/pipewhen bordered section is flooded; open gate or connect pipe tounderground pipe system that releases water flow into reservoir orditch; siphon water from flooded reservoir or ditch to channel waterinto designated areas; shovel or hoe soil to clear ditches/furrows andbuild embankments to appropriately channel water; mix and apply propersolutions to fill holes/cracks in pipes, ditches, and spillways, andmake minor repairs to metal, concrete, and wooden frameworks in pipe andditch valves and gates. Other Irrigation Duties: remove pipes/wheellines from storage and lay out/place in predetermined patterns infields; lubricate, adjust, repair and replace parts such as sprinklerheads and drive chains using hand tools; observe revolving sprinklersand adjust to ensure proper operation and uniform distribution of water;disassemble, service and store pipes/mainlines/wheel lines afterirrigation season. To meet minimum acceptable performance standards whenirrigating, the worker must, after a 10 day conditioning period, move anaverage of at least 48 40-foot sections of 3-inch pipe or 44 40-footsections of 4-inch pipe per hour under normal working conditions.