This job was posted by https://idahoworks.gov : For more information,please see: https://idahoworks.gov/jobs/2151712
Consultants please conduct a seated interview. Applicants must have 20days experience with Farm / Irrigation / Livestock work. Applicantshired must be able to obtain a valid driver\'s license as driving onpublic roads may be required. Applicants must be able to lift up to 100pounds. Dates of need are (3/15/2024 11/15/2024). This order is for workin Twin Falls, Idaho area. Job duties may require split and/or straightshifts depending on crop demands, such as 6:00 to 10:00 AM and 2:00 to6:00 PM. Worker will be required to perform a variety of duties relatedto the production of sugar beets, beans, hay, corn barley, and wheat.The majority of the work activities during the overall contract period,however, will be related to general farm work/irrigation/cropproduction. General Farm Work will include the followingresponsibilities: maintain, drive, attach and operate farmimplements/tractors/equipment to till soil, plant, cultivate, fertilizeand harvest crops; make minor mechanical adjustments and repairs on farmmachinery; may mix and/or spray chemicals (according to appropriaterestrictive use laws, when/if applicable); remove undesirable and excessgrowth from crops or farm grounds; remove rocks from field; paint/repairfarm structures; perform general clean up of farm areas; drive,load/unload trucks; operate motor bike or all-terrain vehicle in thecourse of performing duties. Irrigation duties will include thefollowing: Hand lines: connect pipes; check alignment of pipe and adjustfor proper water distribution; attach lines to water supply; turn onpump; turn valves to start flow of water; disassemble lines and carrypipes across fields at specified intervals; move pipes through freshlyirrigated crops and/or plowed fields where mud may be deep at times;lift and carry pipe sections weighing approximately 40 pounds on asustained basis. Wheel lines: start gasoline engines and operatecontrols to move lines across fields at specified intervals. Pivots:push on switch that activates circle sprinkler system. Flood Irrigation:close gate in ditch/pipe when bordered section is flooded; open gate orconnect pipe to underground pipe system that releases water flow intoreservoir or ditch; siphon water from flooded reservoir or ditch tochannel water into designated areas; shovel or hoe soil to clearditches/furrows and build embankments to appropriately channel water.Other Irrigation Duties: remove pipes/wheel lines from storage and layout/place in predetermined patterns in fields; lubricate, adjust, repairand replace parts such as sprinkler heads and drive chains using handtools; observe revolving sprinklers and adjust to ensure properoperation and uniform distribution of water; disassemble, service andstore pipes/mainlines/wheel lines after irrigation season. To meetminimum acceptable performance standards when irrigating, the workermust, after a 10 day conditioning period, move an average of at least 4840-foot sections of 3-inch pipe or 44 40-foot sections of 4-inch pipeper hour under normal working conditions